Free Construction Bid FormWrite the scope, price labor and materials, list what your bid leaves out and set how long the price holds. Print the bid or save it as a PDF. No sign-up, and nothing you type is uploaded.

Basics

Basics

Estimate or quote?
Your business

Your business

No logo

PNG or JPG. Kept in this browser only, never uploaded.

Customer

Customer and job site

The job

The job

Labor and materials

Quantity or hours × rate. Leave the quantity empty for a fixed price.

Up to 15 lines

Tax is worked out on the subtotal. Use the rate that applies where you work.

A percentage of the total (30%) or an amount (500). Some states limit deposits on home improvement work: see deposits below.

Not included

Not included (optional)

What the price does not cover. Saying it up front avoids arguments later.

Signature

Your signature (optional)

Sign here, or sign the printed copy in ink. The customer signs to accept the estimate.

Notes and terms

Terms (optional)

Printed in small type at the foot of the page.

Wording: change the title and labels

Each box shows the words printed now. Rewrite any of them; an empty box goes back to the standard wording. You can also click any text on the page to rewrite it.

Finished? Print or save your estimate

Print two copies: one for the customer, one for your records.

If you enjoy what I do, consider supporting me on Ko-fi. Every little bit means the world!

If you enjoy what I do, consider supporting me on Ko-fi. Every little bit means the world!

Preview

Click any text on the page to edit it.

Layout

Whole page · the printed page has no watermark or logo.

Pinch to zoom.

Examples2 layouts filled in with made-up details. Open one to start with that layout.

More versions of this form

Notice: Generated via SnapPaperwork. For genuine work and payments only. A document with false amounts, dates or details can be illegal.

Something missing? Tell me what you need.

How to fill in a construction bid form

  1. Say who is bidding and for what

    Put your business at the top, the name of the owner or general contractor you are bidding to, the job site, and a bid number. Then write the scope of work in plain words.

  2. Price the work

    Add a line for each part of the job. Use hours and a rate for labor. Leave the quantity empty for a lump-sum line such as excavation or a retaining wall. The total is worked out for you.

  3. State what the bid leaves out and how long it holds

    List the exclusions, set the valid-until date and add a deposit or payment terms. Print the bid or save a PDF and send it. The other side signs to accept.

What a construction bid should include

  • Your business name and contact details, and who the bid is addressed to
  • The job name and the address of the job site
  • A scope of work that says what you will do, and refers to any drawings or specifications you priced from
  • Prices for each part of the work, so the owner can compare bids line by line
  • What is not included: permits, testing, hidden conditions, finishes, or work by other trades
  • How long the price holds, and the payment terms
  • A line for the owner or contractor to sign and date to accept

Sample lines for a site and concrete bid

The sample bid is for a concrete slab and a block retaining wall. Change the lines to match your own trade. The prices are made up. They are not a price guide, and your numbers should come from your costs, the plans and a look at the site.

  • Excavation, grading and base material (lump sum)
  • Labor by trade crew, in hours at your rate
  • Materials priced as a group, such as concrete and rebar
  • A separate line for each large item, such as a wall, a roof or a set of windows
  • Equipment rental and haul-off
  • An allowance for something the owner has not chosen yet, marked as an allowance

Bid, estimate or quote?

A bid is a price you offer for a defined scope of work, usually to win the job against other bidders. An estimate is your best guess of the cost and can move. This page starts as a firm-price bid, and the same form can be switched to an estimate if you only want to give a rough number.

Because a bid is meant to be compared, the scope and the exclusions matter more than the total. If two bids look far apart, the usual reason is that they priced different work.

Tips for a clear bid

  • Bid from the drawings and a site visit, and say so on the bid.
  • Write exclusions on the bid itself so the owner sees them before signing.
  • Mark any allowances as allowances, so a later change in cost is not a surprise.
  • Say that changes to the scope will be priced in writing first. The change order tool can help with that.
  • Check your own rules on bid deadlines, bonds, licenses and written contracts. They depend on the job, the owner and where you work.

Checked in November 2026. This page is general information, not legal advice. Rules differ from place to place and change over time.

Frequently asked questions

What should a construction bid form include?

Your business details, the owner or contractor you are bidding to, the job site, a scope of work, priced lines for labor and materials, exclusions, a valid-until date, payment terms and a line to accept.

What is the difference between a bid and an estimate?

A bid is a price offered for a defined scope, often to win the work against other bidders. An estimate is an expected cost that can change. This form can be used as either.

How do I price labor and materials on a bid?

List labor by the hour or by the job and group materials as a lump sum or item by item. Leave the quantity empty on a line to treat its rate as a fixed amount. Base the numbers on your own costs, the plans and the site.

Can I list what my bid does not cover?

Yes, and you should. Use the exclusions box for permits, testing, hidden conditions and any work that belongs to another trade, so the owner knows what the price covers.

How long should a construction bid stay valid?

Thirty days is common, and shorter when material prices are moving fast. The form sets 30 days by default and you can change the date.

Does a signed bid become a contract?

Not necessarily. Whether a signed bid is binding on its own, or whether you need a separate written contract, depends on the job and where you work. Check your own rules or ask a professional.

Is this construction bid form free?

Yes. It is free, needs no account and adds no watermark. What you type stays in your browser and is never uploaded.